Gansu Yumen Step-up Substation of CECEP

CECEP Yumen 50 MW Wind Power Complementary Project is located in the Southwest CECEP Changma Wind Farm, Yumen Town, Yumen City, Jiuquan City, Gansu Province. The main construction content is the 50 MW photovoltaic array area, inverter, and the expansion of the main transformer of the Changxi 30KV booster station.

The 35kV epoxy resin cast insulated tubular bus project of Gansu CECEP Yumen Wind Solar Complementary Booster Station is provided with production+installation services by Guangdong High Power Technology Co., Ltd. This product is waterproof, fireproof, corrosion-resistant, earthquake resistant, excellent in low-temperature condensation resistance, simple in layout, beautiful and generous! The epoxy resin cast solid insulated tubular bus is a new generation of bus products. It has been introduced from abroad for more than 20 years. With mature technology and excellent performance, it can guarantee zero fault for 30 years!